<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Diaa Khalaf · Articles</title><description>Articles on leadership and change, project controls, data centres, and life in the UK.</description><link>https://diaakhalaf.com/</link><language>en-gb</language><item><title>Every change needs two plans</title><link>https://diaakhalaf.com/en/articles/change-needs-two-plans/</link><guid isPermaLink="true">https://diaakhalaf.com/en/articles/change-needs-two-plans/</guid><description>We plan change the way we plan a construction project, with a schedule, a budget and milestones. That is only one plan. Change only works when it comes with a second plan, for the people.</description><pubDate>Thu, 12 Nov 2026 09:00:00 GMT</pubDate><content:encoded>&lt;article&gt;&lt;p&gt;In construction and infrastructure projects, nobody starts work without a schedule, a budget and a risk register. When an organisation decides to change how it works, with a new system, a new structure or a new way of managing projects, it does the same: a plan, milestones and a launch date.&lt;/p&gt;&lt;p&gt;That is the &lt;strong&gt;first plan&lt;/strong&gt;: the delivery plan. What we will build or change, when, and at what cost.&lt;/p&gt;&lt;p&gt;In my work in my experiance, I have seen many change projects deliver their first plan exactly on time, and still fail. The system works, the training is done, the final report says &amp;quot;complete&amp;quot;, yet people are still working the old way.&lt;/p&gt;&lt;p&gt;The reason is that these projects had no &lt;strong&gt;second plan&lt;/strong&gt;: the people plan.&lt;/p&gt;&lt;h2 id=&quot;s1&quot;&gt;What does the first plan measure?&lt;/h2&gt;&lt;p&gt;The first plan measures what we deliver. Is the system installed? Were the training sessions held? Has the new guide been issued?&lt;/p&gt;&lt;p&gt;Those questions matter, but they are all about &lt;strong&gt;outputs&lt;/strong&gt;. None of them answers the question the project started with: has the way people work actually changed?&lt;/p&gt;&lt;blockquote class=&quot;pull&quot;&gt;&lt;p&gt;A project delivers new tools. Change only happens when people choose to use them.&lt;/p&gt;&lt;/blockquote&gt;&lt;h2 id=&quot;s2&quot;&gt;What goes into a people plan?&lt;/h2&gt;&lt;p&gt;A people plan is not another heavy document. It is a short set of questions, answered as seriously as the questions in the schedule:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;strong&gt;Who is affected?&lt;/strong&gt; Not &amp;quot;all staff&amp;quot;, but specific groups, each with something to lose and something to gain.&lt;/li&gt;&lt;li&gt;&lt;strong&gt;What do we need each group to do differently?&lt;/strong&gt; A clear, observable behaviour, not a slogan.&lt;/li&gt;&lt;li&gt;&lt;strong&gt;Who will lead the change in each team?&lt;/strong&gt; Usually the line manager, not the project team.&lt;/li&gt;&lt;li&gt;&lt;strong&gt;How will we know the change has happened?&lt;/strong&gt; Measures of behaviour, not of activity.&lt;/li&gt;&lt;li&gt;&lt;strong&gt;When do we step back support?&lt;/strong&gt; Only once the new habits have settled, not when the contract ends.&lt;/li&gt;&lt;/ul&gt;&lt;h2 id=&quot;s3&quot;&gt;Link the two plans in one schedule&lt;/h2&gt;&lt;p&gt;The biggest mistake is keeping the two plans in separate files: the schedule with the PMO, the communication plan with HR. Then the system slips two weeks, and the launch email still goes out on the original date.&lt;/p&gt;&lt;p&gt;Put the people activities in the same schedule: briefings, manager training, adoption checkpoints. Tie them to the project milestones, so that when one moves, the other moves with it.&lt;/p&gt;&lt;div class=&quot;tip&quot;&gt;&lt;b&gt;Practical tip&lt;/b&gt;&lt;p&gt;Add three adoption measures to the monthly project report, next to schedule and cost. When decision-makers see them in the same place, they treat them just as seriously.&lt;/p&gt;&lt;/div&gt;&lt;h2 id=&quot;s4&quot;&gt;Measure adoption the way you measure progress&lt;/h2&gt;&lt;p&gt;In project controls we always compare planned against actual. We can do the same with change: what share of teams should be working the new way this month, and what share actually are?&lt;/p&gt;&lt;p&gt;The gap between the two is the &amp;quot;adoption variance&amp;quot;. If it is negative, the project is behind, even if every line of the schedule is green.&lt;/p&gt;&lt;figure&gt;&lt;svg viewBox=&quot;0 0 640 260&quot; role=&quot;img&quot; aria-label=&quot;Shock and denial → Resistance → Experimenting → Adoption&quot;&gt;
    &lt;g stroke=&quot;#E6E1D8&quot; stroke-width=&quot;1&quot;&gt;
      &lt;line x1=&quot;36&quot; y1=&quot;20&quot; x2=&quot;36&quot; y2=&quot;240&quot;/&gt;&lt;line x1=&quot;36&quot; y1=&quot;240&quot; x2=&quot;620&quot; y2=&quot;240&quot;/&gt;
    &lt;/g&gt;
    &lt;g &gt;
      &lt;path d=&quot;M40 96 C 130 96, 160 200, 232 200 S 330 160, 392 148 S 500 90, 610 50&quot; fill=&quot;none&quot; stroke=&quot;#1F3A68&quot; stroke-width=&quot;3&quot; stroke-linecap=&quot;round&quot;/&gt;
      &lt;circle cx=&quot;78&quot; cy=&quot;96&quot; r=&quot;6&quot; fill=&quot;#A9781F&quot; stroke=&quot;#FFFFFF&quot; stroke-width=&quot;2&quot;/&gt;&lt;circle cx=&quot;232&quot; cy=&quot;200&quot; r=&quot;6&quot; fill=&quot;#A9781F&quot; stroke=&quot;#FFFFFF&quot; stroke-width=&quot;2&quot;/&gt;&lt;circle cx=&quot;392&quot; cy=&quot;148&quot; r=&quot;6&quot; fill=&quot;#A9781F&quot; stroke=&quot;#FFFFFF&quot; stroke-width=&quot;2&quot;/&gt;&lt;circle cx=&quot;560&quot; cy=&quot;62&quot; r=&quot;6&quot; fill=&quot;#A9781F&quot; stroke=&quot;#FFFFFF&quot; stroke-width=&quot;2&quot;/&gt;
    &lt;/g&gt;
    &lt;text x=&quot;78&quot; y=&quot;72&quot; text-anchor=&quot;middle&quot; font-family=&quot;Tajawal, sans-serif&quot; font-size=&quot;15&quot; font-weight=&quot;500&quot; fill=&quot;#16202F&quot;&gt;Shock and denial&lt;/text&gt;&lt;text x=&quot;232&quot; y=&quot;232&quot; text-anchor=&quot;middle&quot; font-family=&quot;Tajawal, sans-serif&quot; font-size=&quot;15&quot; font-weight=&quot;500&quot; fill=&quot;#16202F&quot;&gt;Resistance&lt;/text&gt;&lt;text x=&quot;392&quot; y=&quot;124&quot; text-anchor=&quot;middle&quot; font-family=&quot;Tajawal, sans-serif&quot; font-size=&quot;15&quot; font-weight=&quot;500&quot; fill=&quot;#16202F&quot;&gt;Experimenting&lt;/text&gt;&lt;text x=&quot;560&quot; y=&quot;38&quot; text-anchor=&quot;middle&quot; font-family=&quot;Tajawal, sans-serif&quot; font-size=&quot;15&quot; font-weight=&quot;500&quot; fill=&quot;#16202F&quot;&gt;Adoption&lt;/text&gt;
    &lt;text x=&quot;620&quot; y=&quot;256&quot; text-anchor=&quot;end&quot; font-family=&quot;Tajawal, sans-serif&quot; font-size=&quot;13&quot; fill=&quot;#5D6472&quot;&gt;Time →&lt;/text&gt;
    &lt;text x=&quot;46&quot; y=&quot;30&quot; text-anchor=&quot;start&quot; font-family=&quot;Tajawal, sans-serif&quot; font-size=&quot;13&quot; fill=&quot;#5D6472&quot;&gt;Performance and confidence&lt;/text&gt;
  &lt;/svg&gt;&lt;figcaption&gt;During change, performance and confidence dip before they improve. The people plan is what makes the dip shorter.&lt;/figcaption&gt;&lt;/figure&gt;&lt;h2 id=&quot;s5&quot;&gt;Summary&lt;/h2&gt;&lt;div class=&quot;take&quot;&gt;&lt;h3&gt;Before your next change project&lt;/h3&gt;&lt;ul&gt;&lt;li&gt;Write two plans: the delivery plan and the people plan.&lt;/li&gt;&lt;li&gt;Define the new behaviour you need from each affected group.&lt;/li&gt;&lt;li&gt;Put the people activities in the same schedule.&lt;/li&gt;&lt;li&gt;Measure real adoption, and compare it with the plan every month.&lt;/li&gt;&lt;li&gt;Declare success when the new habits have settled, not when the system is handed over.&lt;/li&gt;&lt;/ul&gt;&lt;/div&gt;&lt;/article&gt;</content:encoded></item></channel></rss>